Consistent design standards, supported by local planning, permitting and regulatory expertise across Europe.

Brian Murphy is Managing Director of Hyceon, with more than 35 years of industry experience. He led the business’ growth from an Irish architectural practice into an international data centre design partner. Today, he shapes Hyceon’s strategic direction, building lasting client relationships and partnerships to support its expansion across Europe.

Brian Murphy, Managing Director

If you have delivered a data centre project in more than one European country, you know that successful delivery takes more than a good design. It also requires a clear understanding of the local planning, permitting, power and regulatory requirements that can affect project timelines and costs. 

Even when the underlying design remains consistent, local requirements can significantly influence how a project is approved and built. Understanding these differences early helps avoid redesigns, delays and unexpected costs.  

The challenges are familiar to anyone delivering data centre projects across European markets: 

  • Backup generators: In Germany, emissions-control permitting under the Federal Immission Control Act (BImSchG) can require generator flue stacks to meet calculated minimum heights. This can affect building height, massing and planning applications. In other markets, comparable requirements may not apply. 
  • Planning and architecture: Local plans can determine building heights, setbacks, façade treatments and landscaping. Some local authorities also analyse a building’s appearance as part of the planning process. A design accepted in one industrial zone may need a different building envelope a few hundred kilometres away. 
  • Grid connection and power supply: Connection requirements, capacity constraints and delivery timelines vary considerably across Europe. From Ireland’s requirements for new data centre grid connections to grid access milestones in Spain and Portugal, these factors influence site selection as much as design. 
  • Water and heat: Water availability, discharge requirements and opportunities to connect to district heating networks vary by region, as do the expectations of the relevant authorities. 

These differences do not necessarily change the core design, but they can change how a project is approved and delivered. Understanding which elements can remain standardised and which need to respond to local requirements, from the earliest site assessment, helps prevent redesigns, delays and cost overruns. 

Hyceon brings together experience from two of Europe’s most demanding data centre markets. Our roots go back to Dublin in 1988 and Frankfurt in 1990, and our experience in both markets continues to drive and strengthen our approach in data centre design and delivery. 

In Germany, under the Energy Efficiency Act (EnEfG), new data centres beginning operation on or after 1 July 2026 must reach a power usage effectiveness (PUE) of 1.2 or lower. They must also reuse a minimum share of their energy: According to London-based Bird & Bird, the law sets 10% from 1 July 2026, 15% from 1 July 2027 and 20% from 1 July 2028 for facilities going into operation. Renewable electricity requirements, assessed on a balance-sheet basis, are tightening too, requiring 50% from 1 January 2024 and 100% from 1 January 2027, according to Stein law firm. 

In Ireland, grid capacity decides whether a project goes ahead at all. Under the CRU’s December 2025 Connection Policy, new data centres at 10 MVA or above must bring their own dispatchable onsite or nearby generation and/or storage capacity, and the de-rated capacity must match the site’s maximum import capacity, reports law firm Mason Hayes & Curran. Within six years of energisation, 80% of their annual demand must come from additional renewable generation in Ireland, according to the CRU. 

Together, these experiences inform our approach to projects across the UK, France, Italy, Spain, Portugal, Poland, Austria and the Nordic countries. 

Our baseline design approach draws on Germany’s energy efficiency and energy reuse obligations, Ireland’s grid connection and security of supply requirements, and the common reporting framework established by the EU Energy Efficiency Directive. 

In markets where requirements are less demanding today, this approach may appear to go beyond what is immediately necessary. In practice, designing with demanding regulatory standards in mind can help reduce the need for future modifications as requirements evolve across Europe. 

A design built around robust standards can offer three clear advantages: 

  • Greater resilience to regulatory change: Reduces the likelihood of significant redesign as national requirements evolve. 
  • Long term asset value: Helps maintain the appeal of assets to investors and tenants as expectations change. 
  • Consistency across portfolios: Gives operators a common design standard rather than multiple country specific versions. 

Heat reuse is a good example. In Germany, energy reuse obligations make it important to consider the infrastructure needed to capture and transfer waste heat. This can include reserving space for a heat transfer station, even where a suitable network is not yet available. In other markets, heat reuse may not yet be mandatory. Designing for it from the outset, with the necessary space, connection points and operating temperatures, preserves the option to connect to a district heating network if a suitable partner becomes available later. 

A strong design does not secure planning permission on its own. Every country, and often every local authority, has its own procedures, timelines, decision makers and expectations.  

That is why we coordinate permitting across markets while working with local teams who understand the relevant planning systems, regulatory requirements and approval processes. The people involved in pre-application meetings, public consultations and technical reviews understand how the process works, who needs to be consulted and what questions are likely to arise. They also understand the issues receiving increasing examination. Across Europe, authorities are paying close attention to noise and vibration, air quality, water and wastewater, ecology, traffic and visual impact. 

Applications are better positioned when these issues are addressed before submission, rather than raised for the first time during the assessment process. We commission the necessary assessments early and incorporate appropriate mitigation measures into the master plan. This helps align the design submitted for approval with the project ultimately delivered. 

Designed for demanding standards. Delivered locally. 

With Hyceon, operators benefit from consistent design standards across markets, developers gain access to local planning and regulatory expertise, and investors benefit from assets designed with evolving requirements in mind. 

Clients work with one Hyceon team, from feasibility through to commissioning, bringing together: 

  • One consistent design standard, informed by the most demanding applicable requirements. 
  • One technical assurance and quality process across every project. 
  • Shared sustainability benchmarks for energy, water, carbon and materials. 
  • Local teams and partners in each market, equipped to work in the language of the relevant authorities. 

The result is a consistent European approach, supported by the local expertise needed to turn designs into deliverable projects. 

Talk to our team about your next European data centre project. 

Regulatory information checked as of October 2026. 